Summary

This charter school was built in the early 2000’s on a super low budget with 1 IT guy. 20 years later, their network was extremely dated, so they called us in to revamp the whole thing. Clean up the server room, replace all network equipment, wiring, and security cameras.

Before the project was finalized, we had removed over 19,000 ft of cable and installed around 24,000 ft of cable in replacement. We eliminated the entire need for 1 server, replaced every piece of networking equipment, removed an outdated camera system and replaced with UniFi Protect cameras, and had a significantly more efficient and reliable network.

Pictures

Before

Untitled

Untitled

During (finding even more mess)

Untitled

Untitled.png

Untitled

After

The Purple lines were ran for the Security cameras, which were delayed for install (due to client) for a few months.